Use of the Forest

Public use of Saginaw Forest is encouraged. Rules for the public's use include (but are not limited to):

Friday, October 8, 2010

Carrying wood

In an effort to get ready for the upcoming SNRE campfire activities, I needed to find some wood for the cross-cut saw competition. Luckily a pine fell near the cabin, so it didn't make for such a long schlep to the campfire circle.



Still, it did end up bruising my shoulder carrying over four logs:
IMG_3924

Wrong sand

The wrong material is out in the forest...

The wrong sand...
so they are removing it today from this pile...

IMG_3902
... as well as what they had already spread on the trail.

Hopefully, the crew today won't tear up the grass too much with their equipment while they load up their dumptrucks to truck out the wrong sand.

Wednesday, October 6, 2010

Please dispose of your dog's droppings

Although the vast majority of people do pick up after their dogs, some people just choose to leave their plastic fecal bags lying in the forest. One of the rules-of-use (and I think its a pretty fair one) is that, "Dog owners must carry out all pet waste; please bring your own doggie bag to do so."

If visitors are going to be walking past the front entrance (not because one has parked a car there, though, of course), they can avail themselves to the use of the trashcan located a few yards inside of the main gate:

IMG_3870
(It's the very obvious black, trashcan-looking object to the right of the photo.)

There, dog-owners (or good Samaritans who choose to pick up after those less civic-minded visitors) can add their canine fecal bags to the pile of other such baggies. Once the new bag has been added, make sure that the lid is properly sealing the can and locked down with both handles.

If guests leave by other exits, they should carry their baggies with them out of the forest and dispose of them in a (hopefully) civic-minded manner.

Misty morning ... with a touch of construction equipment

I really like these fall mornings: mist on Third Sister and the sun rising against the ever-more-ruddy far shore. Of course, with construction activities going on related to the larger management plan for the forest, the far-shore colors also have near-shore equipment that creates a somewhat jarring view from what was seen last year.

Sunrise, mist, and contruction

Of course, with the addition of a dock, one can get a little further out into that mist than before...
IMG_3883

Forest ecology in the forest

Prof. Ibáñez's Forest Ecology class has been out in Saginaw Forest over the past few weeks, learning and utilizing field methodology for doing (you guessed it) forest ecology.

IMG_3842
Sometimes, although you feel like you are in the middle of an idyllic sylvan setting, peer pressure to get the work done can be quite overpowering...

IMG_3850
When measuring forest flora, shooting lasers at tree-tops is what is called for in order to determine a plant's height...

IMG_3853
...and at other times, taking a standard field tape measure is still the best way to do it.

Monday, October 4, 2010

Construction progress

Last week, work on the management plan began, with clearing shoreline brush and reeds for the installation of the dock. Today, thanks to the installation of the supports last Thursday, the work continued apace, with the builders finishing much of the structure of the dock, making it likely that they will finish covering it tomorrow. Next at this site: the installation of a "corduroy path" to allow wheeled access from the drive.



Meanwhile, the construction of the east path was stalled until today, when the siltscreens (straw lining packed in a biodegradable mesh) were installed, and a Bobcat digger was brought in. As of 4PM on Monday, the trail-blazing crew has advanced roughly 30 meters from the east-end of the property, and should be back to the cabin by the end of tomorrow, barring any major problems.

Still, the acts of this team has changed changed the nature of the eastern pathway, transforming it from a narrow footpath first into a cleared path by scraping and cutting away the groundcover vegetation and now into a path cut into the ground for eventual packing with gravel.

Split in the path
Before

Split in the path
Cleared (and slightly widened)

IMG_3797
A new pathway is cut

The other part of the construction (the small bridge over the ephemeral stream) is waiting until other things take place: the blazing of the trail and the completion of the dock. Perhaps they will start by tomorrow...?



UPDATE: The photos in the slideshows cover all photos of the building of each structure. Therefore, the timeline of the slideshow goes beyond the description in the text.

Contractors out early

I was lying in bed at 7:30 -- just looking at the ceiling and contemplating the morning -- and I heard two dull thuds. "Hm. Perhaps its a tree falling across the lake," I thought. And then some muffled talking ensued.

A moment before my mind put together these two pieces of information and threw away the notion that the contractors might not come before 9am got me out into the morning chill. Indeed, two had come out, waiting for a third to drop off more lumber for the building of the dock and bridge. Yesss!

The night had not gotten quite down to freezing, and the forecast is calling for another warm spell by the weekend, but I would hazard that autumn is upon us. The mist on the lake was minimal, but looked really nice with the warm colors of the turning leaves behind.