The bridge turned out to be higher off of the stream bed than originally thought, and so it was decided that a handrail would, indeed, be a necessary addition. Too, a longer footing was installed to help control erosion of the ramps that were built up to the bridge itself.

... oh, and the contractors' port-a-john was finally removed.
No comments:
Post a Comment